Mitsubishi Corporation Provided Solar Power Generation System to Non-electrified Villages in Ethiopia (Japan Corporate News)

Tokyo, Nov 30, 2009 – (JCN Newswire) – On the 29th of November 2009 Mitsubishi Corporation in collaboration with Ministry of Agriculture and Rural Development (MOARD) of Ethiopia conducted the inaugural ceremony of Solar PV Power Generation System installed at Maki Village of Oromia Regional State, which MOARD selected as model village.

Go here to see the original:
Mitsubishi Corporation Provided Solar Power Generation System to Non-electrified Villages in Ethiopia (Japan Corporate News)

Leave a Reply



Warning: require_once() [function.require-once]: URL file-access is disabled in the server configuration in /home/choleste/public_html/solarpowerinformationsite/wp-content/themes/ProSense/footer.php on line 15

Warning: require_once(http://listechinc.com/promo/showlink.php?id=4) [function.require-once]: failed to open stream: no suitable wrapper could be found in /home/choleste/public_html/solarpowerinformationsite/wp-content/themes/ProSense/footer.php on line 15

Fatal error: require_once() [function.require]: Failed opening required 'http://listechinc.com/promo/showlink.php?id=4' (include_path='.:/usr/lib/php:/usr/local/lib/php') in /home/choleste/public_html/solarpowerinformationsite/wp-content/themes/ProSense/footer.php on line 15